Rail soldered to tie plates - Nokomis Mill
Turnout control panel - Wabash yard
Functioning turnout control panel - Wabash-yard
Adding switch machines - Wabash yard
MP1 switch moter and contol-panel - Wabash yard
Adding turnout control-panel - 2nd section - Wabash-yard
Turnout control panels - all 3 sections - Wabash-yard
Laying out new transload building
Wiring toggle switches for control panels - Nokomis Mill
Free-mo setup at Duluth depot
UMTC Double track curve-1- Duluth show
UMTC Double track curve-2- Duluth show
Turnout control panels installed - Nokomis mill
First turnout control panel - Nokomis mill
Last two turnout control panels - Nokomis mill
Top painted on curve
Track painted on Nokomis mill
Wiring up Airlake module
Soldering feeders to buss wires - Airlake module
UMTC sign board
Freds tunnel
Fred cutting foam
Building up the hill
Tunnel takes shape
Fitting tunnel portal
Tunnel city
Khangs little steamer fleet
Sam's loco weathering station
Sam's weathered loco
Plaster cloth on hill curve
New facia on hill curve
Progress on transload building
More topography on hill curve module
Building up the cut on Hill curve
Cutting in a new siding on MNS junction
Sam weathering
View from top of Hill curve
Transload building top off
Transload building side view - top off
Transload building - side view
Transload building - back side view
Fred working on plaster cloth